North Hollywood to Pasadena Bus RAPID Transit Corridor Project - Virtual Outreach Event - May 1, 2025
- BuildOUT California
- Apr 17
- 1 min read

BuildIT is proud to amplify the message from our partners from Myers-Shimmick, a Joint Venture, to have small and diverse construction subcontracting firms, including Small Business Enterprise (SBE) and Disabled Veteran Business Enterprise (DVBE) firms, to join their North Hollywood to Pasadena BRT Corridor project team.
This is a Zoom even t— join them virtually to learn more and connect with their exceptional team!
Opportunities/Scopes of Work in Phase 2 include, but are not limited to:
• Utility Relocation/Protection Services
• Concrete and Asphalt Paving Services
• Minor Concrete – Curb/Gutter/Sidewalk/Hardscape
• Temporary Engineering Design
• Geotechnical and Small Diameter CIDH Services
• Bus Shelter Fabrication and Installation
• Traffic Signal Services
• Street Lighting Services
• Bus Station Electrical Services
• Landscaping Services
• Traffic Control Services
• Environmental Services
• Quality Control Services
• Wayfinding Signage
• Street Signage
• Trucking
• Street Sweeping Services
• Survey Services
• Water Truck Services
• Equipment Rental Services
Register here for this virtual event: https://bit.ly/MyersShimmickJV
Comments